• Skip to primary navigation
  • Skip to content
  • Skip to footer
Hoffmann-Hayman Coffee Co.
  • News
  • Brands
  • Galleries
  • History
  • Stories
  • People
  • Resources
  • Wanted
  • Mystery
  • About
  • Credits
  • Accession Register
  • Contact
    1. Home
    2. /
    3. Knowledge base
    4. /
    5. Artifacts
    6. /
    7. First-floor bathroom — exposed metal lath under the plaster, next to the vault

    First-floor bathroom — exposed metal lath under the plaster, next to the vault

    Exposed expanded-diamond metal lath underlying the plaster wall treatment in the first-floor bathroom at the Hoffmann-Hayman factory, immediately adjacent to the vault — with patches of plaster fallen away to reveal the lath and the red brick wall behind it
    Exposed expanded-diamond metal lath underlying the plaster wall treatment in the first-floor bathroom at the Hoffmann-Hayman factory, immediately adjacent to the vault — with patches of plaster fallen away to reveal the lath and the red brick wall behind it
    Catalog ID
    HH-FACT-0000-0012
    Gallery
    Factory
    • Follow:
    • Feed
    © 2026 Hoffmann-Hayman Coffee Co.. Powered by Jekyll & Minimal Mistakes.